TAKAKO 2 FACTORY
TAKAKO 2 FACTORY.
Location: VSIP I IP, Binh Duong Province.
Area general: 24.955 m2
Construction times: 2012
ELECTRICAL WORK
- Substation, Main feeder system.
- Telephone, LAN, Fire alarm, Public Address system.
- Earthing and Lightning system.
MECHANICAL WORK
- Air conditioning and ventilation system.
- Compressed air system.
- Water supply system.
- Waste water system.
- Fire Fighting system.
- Cooling Pad system.